| China–Pakistan Economic Corridor (CPEC) | ||
|---|---|---|
| CPEC-energy priority projects | ||
| Project Name | MW | Estimated Cost (US$ M) |
| 2×660MW Coal-fired Power Plants at Port Qasim Karachi | 1320 | 1912.2 |
| Suki Kinari Hydropower Station, Naran,Khyber Pukhtunkhwa | 870 | 1956 |
| Sahiwal 2x660MW Coal-fired Power Plant, Punjab | 1320 | 1912.2 |
| Engro Thar Block II 2×330MW Coal fired Power Plant | 660 | 2,000 |
| TEL 1×330MW Mine Mouth Lignite Fired Power Project at Thar Block-II, Sindh, Pakistan | 330 | – |
| ThalNova 1×330MW Mine Mouth Lignite Fired Power Project at Thar Block-II, Sindh, Pakistan | 330 | – |
| Surface mine in block II of Thar Coal field, 3.8 million tons/year | – | 1,470 |
| Hydro China Dawood Wind Farm(Gharo, Thatta) | 49.5 | 112.65 |
| 300MW Imported Coal Based Power Project at Gwadar, Pakistan | 300 | Yet to be determined |
| Quaid-e-Azam 1000 MW Solar Park (Bahawalpur) Quaid-e-Azam | 300 | 1,302 |
| 600 | – | |
| 100 | – | |
| UEP Wind Farm (Jhimpir, Thatta) | 99 | 250 |
| Sachal Wind Farm (Jhimpir, Thatta) | 49.5 | 134 |
| SSRL Thar Coal Block-I 6.8 mtpa &SEC Mine Mouth Power Plant(2×660MW) | 1320 | 2,000 + 1,300 |
| Karot Hydropower Station | 720 | 1698 |
| Three Gorges Second Wind Power Project | 49.5 | 150 |
| Three Gorges Third Wind Power Project | 49.5 | |
| CPHGC 1,320MW Coal-fired Power Plant, Hub,Balochistan | 1320 | 1912.2 |
| Matiari to Lahore ±660kV HVDC Transmission Line Project | – | 1658.34 |
| Matiari (Port Qasim) —Faisalabad Transmission Line Project | – | 1,500 |
| Thar Mine Mouth Oracle Power Plant ( 1320MW) & surface mine | 1320 | Yet to be determined |
[divider style=”normal” top=”20″ bottom=”20″]
| CPEC-energy actively promoted projects | ||
|---|---|---|
| Project Name | MW | Estimated Cost(US$ M) |
| Kohala Hydel Project, AJK | 1100 | 2355 |
| Rahimyar khan imported fuel Power Plant 1320 MW | 1320 | 1,600 |
| Cacho 50MW Wind Power Project | 50 | – |
| Western Energy (Pvt.) Ltd. 50MW Wind Power Project | 50 | – |
[divider style=”normal” top=”20″ bottom=”20″]
| CPEC-potential energy projects | ||
|---|---|---|
| Project Name | MW | Estimated Cost(US$ M) |
| Phandar Hydropower Station | 80 | – |
| Gilgit KIU Hydropower | 100 | |
[divider style=”normal” top=”20″ bottom=”20″]
[ads1]
| CPEC infrastructure projects | ||
|---|---|---|
| Project Name | Length (KM) | Estimated Cost(US$ M) |
| KKH Phase II (Thakot -Havelian Section) | 118 | 1,366 |
| Peshawar-Karachi Motorway (Multan-Sukkur Section) | 392 | 2,980 |
| Khuzdar-Basima Road N-30 (110 km) | 110 | 80 |
| Upgradation of D.I.Khan (Yarik) – Zhob, N-50 Phase-I (210 km) | 210 | 195 |
| KKH Thakot-Raikot N35 remaining portion (136 Km) | 136 | 719.8 |
| Expansion and reconstruction of existing Line ML-1 | 1,830 | 8,172 |
| Havelian Dry port (450 M. Twenty-Foot Equivalent Units) | – | 65 |
| Capacity Development of Pakistan Railways | – | – |
[divider style=”normal” top=”20″ bottom=”20″]
| CPEC Gwadar projects | ||
|---|---|---|
| S.No | Project Name | Estimated Cost(US$ M) |
| 1 | Gwadar East-Bay Expressway | 140.6 |
| 2 | New Gwadar International Airport | 230 |
| 3 | Construction of Breakwaters | 123 |
| 4 | Dredging of berthing areas & channels | 27 |
| 5 | Development of Free Zone | 32 |
| 6 | Necessary facilities of fresh water treatment, water supply and distribution | 130 |
| 7 | Pak China Friendship Hospital | 100 |
| 8 | Pak-China Technical and Vocational Institute at Gwadar | 10 |
| 9 | Gwadar Smart Port City Master Plan | 4 |
| 10 | Bao Steel Park, petrochemicals, stainless steel and other industries in Gwadar | |
| 11 | Development of Gwadar University (Social Sector Development) | |
| 12 | Gwadar Livelihood Project | |
[divider style=”normal” top=”20″ bottom=”20″]
| CPEC Others Projects | ||
|---|---|---|
| S.No | Project Name | Estimated Cost (US$ M) |
| 1 | Cross Border Optical Fiber Cable | 44 |
| 2 | Pilot Project of Digital Terrestrial Multimedia Broadcast (DTMB) | |
| 3 | Early Warning System (EWS), Pakistan Meteorological Department | |