Logistics & Transportation – how technology is breaking boundaries (Facts & Figures)

Post Budget 2025-26 (Facts & Figures)
Motorway Network
Sr. No. Motorway Length (Km) Status
1 Peshawar- Islamabad, M-1 156 Completed
2 Islamabad – Lahore, M-2 357 Completed
3 Havelian – Mansehra 39 Under construction
4 Hazara Motorway (E-35) 59 Under construction
5 Hakla-D.I Khan 285 Completion: Jun, 2020
6 Sialkot – Lahore 91 Completion; Dec, 2019
7 Lahore – Abdul Hakeem, M-3 230 Completion: Mar, 2019
8 Pindi Bhattian – Faisalabad, M-4 57 Completed
9 Faislabad – Gojra, M-4 58 Completed
10 Gojra- Shorkot, M-4 62 Completed
11 Shorkot – Khanewal, M-4 64 Completed
12 Khanewal – Multan, M-4 56 Completed
13 Sukkur – Multan (M-5) 392 Completion: Sep, 2019
14 Hyderabad – Sukkur, (M-6) 296 Procurement under process
15 Karachi-Hyderabad (M-9) 136 Completion: June 2019
2362.3
Source: National Highway Authority

[divider style=”normal” top=”20″ bottom=”20″]

CPEC Portfolio
Projects Status Cost(US$ M)
Energy (IPP financing mode) Completed 4,979
Cross Border Optical Fiber Project (GCL) Completed 37.4
DTMB (Grant) Completed 4
Energy (IPP financing mode) Under Implementation 18,258
Transport and Infrastructure (GCL) 3 projects Under Implementation 5,830
Eastbay Expressway Gwadar (Interest free Loan) Under Implementation 166
Gwadar City Master Plan and Airport (Grant) Under Implementation 257
29,531.4
Energy (IPP financing mode) In Pipeline 11,523
Main-Line-1 (ML-1) (GCL) In Pipeline 8,250
Gwadar Projects (Grant) 6 projects In Pipeline 357
Grand Total 49,661.4
Source: Ministry of Planning, Development and Reform

[divider style=”normal” top=”20″ bottom=”20″]

[ads1]

 

Cargo, Container Handling & Ship Movement At Karachi Port (000 tons)
Fiscal Year Imports Exports Total %Change
Imports Exports Total
2011-12 26,201 11,674 37,875
2012-13 26,700 21,150 38,850 2 81 3
2013-14 30,343 11,007 41,350 14 -48 6
2014-15 29,672 13,750 43,422 -2 25 5
2015-16 34,594 15,451 50,045 17 12 15
2016-17 42,638 9,855 52,493 23 -36 5
2017-18 41,669 13,016 54,685 -2 32 4
2017-18 (Jul-Ma) 31,789 9,206 40,995
2018-19 (Jul-Mar) 24,945 10,415 35,361 -22 13 -14

[divider style=”normal” top=”20″ bottom=”20″]

Western Alignment Projects
Sr. No. Project Name Length (Km) Status Indicative Plan Period
1 Hakla (Islamabad) – Yarik (DI Khan) 285 Under Construction 2013-20
2 Yarik – Zhob (N-50) 235 PC-I approved Detailed Design is in Process 20 18-23
3 Zhob – Quetta (N-50) 331 PC-I approved 20 18-23
4 Quetta – Khuzdar (N-25) 306 Detailed Design is in Progress 20 18-23
5 Surab-Hoshab (N-85) 449 Completed
6 Hoshab- Gwadar (M-8) 193 Completed
Source: NHA

[divider style=”normal” top=”20″ bottom=”20″]

Central Alignment Projects
Sr. No. Project Name Length (Km) Status Indicative Plan Period
1 DI Khan – D.G. Khan 229 Feasibility Study Plan in 2025 2025-30
2 D.G. Khan – DeraAllahyar 303 Feasibility Study Plan in 2025 2025-30
3 Den Allahyar – Wangu Hills 94 Feasibility Study Plan in 2025 2025-30
Source: NHA